5-8
(2) Connect the Makeup IN joint to the shutoff valve
and fix it to the boss on the heating unit.
(3) Put the Makeup IN joint in the groove of MGV holder.
(4) Attach the MGV holder and fix the shutoff valve.
(5) Put the MGV filter, O-ring3.9, Nozzle-IN-joint and nozzle-IN joint presser foot.
(6) Assemble the shutoff valve connector.
(7) Eject ink after the assembly is completed, and confirm that there is no leak
from each joint area.
(8) Attach Head cover and Heater cover.
Summary of Contents for UX Twin Nozzle
Page 1: ...Service Manual HITACHI Printer UX Twin Nozzle Model Revision February 2017 Version A ...
Page 106: ...3 30 Circuit diagram of EZJ127A board ...
Page 123: ...3 47 Circuit diagram of EZJ129 board ...
Page 131: ...3 55 3 3 20 Electrical Connection Diagram ...
Page 151: ...4 17 7 Reset the time of the replaced solenoid to 0 on the Parts usage time management screen ...
Page 352: ...7 1 7 Attached Drawing 7 1 Circulation System Diagram Circulation System Diagram ...
Page 354: ...7 3 7 3 Electrical Connection Diagram Electrical Connection Diagram ...