
4-20
4.6.2 Pressure Sensor (Nozzle 2) Replacement Procedure
1 Perform
“Nozzle Backwash 2”. (Till stopped automatically without sucking
the makeup into the gutter)
2 Turn off the power supply.
3 Perform
“4.1.3 Access to the parts on the rear side of the equipment”.
(The reason is that the connector is located on the rear side of the equipment.)
4 Remove the connector of the pressure sensor.
5 Remove the screws that fix the
Solenoid valve base
.
Connector for pressure sensor
Unit door
Pressure sensor
[Caution]
When unplugging the connector, be
sure to pull out straight. Do not twist
off or it may break the connector.
Fixing screws for solenoid valve base
Summary of Contents for UX Twin Nozzle
Page 1: ...Service Manual HITACHI Printer UX Twin Nozzle Model Revision February 2017 Version A ...
Page 106: ...3 30 Circuit diagram of EZJ127A board ...
Page 123: ...3 47 Circuit diagram of EZJ129 board ...
Page 131: ...3 55 3 3 20 Electrical Connection Diagram ...
Page 151: ...4 17 7 Reset the time of the replaced solenoid to 0 on the Parts usage time management screen ...
Page 352: ...7 1 7 Attached Drawing 7 1 Circulation System Diagram Circulation System Diagram ...
Page 354: ...7 3 7 3 Electrical Connection Diagram Electrical Connection Diagram ...