4-4
4.1.2 Access to the parts on the front side of the equipment
1 Remove the Inner cover (T).
.
2 Remove the fixing screws (2 pieces) and draw the reservoir unit out to the front
halfway by supporting
“a” part (4 places) with both hands.
3 Remove the tubes and cables from the clamp.
4 Pull the reservoir unit out further and put it on the maintenance cover.
Reservoir Unit
Remove
Clamp
Tube/Cable
Tube/Cable
Clamp
[CAUTION]
Carefully mount the Reservoir unit back
to its place so that the piping tube of
the recovery filter is not pinched.
After performing the task of pulling the
Reservoir unit, please make sure that the
level sensor is functioning normally.
Fixing screws
Pull out Reservoir Unit
Reservoir Unit
Inner cover (B)
a
a
【
CAUTION
】
Please do not remove the
lock pin guard.
When it is removed by any
chance, please return it to
the original position.
Lock pin guard
Maintenance cover
Summary of Contents for UX Twin Nozzle
Page 1: ...Service Manual HITACHI Printer UX Twin Nozzle Model Revision February 2017 Version A ...
Page 106: ...3 30 Circuit diagram of EZJ127A board ...
Page 123: ...3 47 Circuit diagram of EZJ129 board ...
Page 131: ...3 55 3 3 20 Electrical Connection Diagram ...
Page 151: ...4 17 7 Reset the time of the replaced solenoid to 0 on the Parts usage time management screen ...
Page 352: ...7 1 7 Attached Drawing 7 1 Circulation System Diagram Circulation System Diagram ...
Page 354: ...7 3 7 3 Electrical Connection Diagram Electrical Connection Diagram ...