
3-35
(3) Remove the connectors (CN1, 2, 3, 4) and replace EZJ139 board, with a new one.
Remove fixing spacer(1piece), fixing screw(1 piece) and board fixing plate mount.
(4) Insert the connectors of CN1, CN2, CN3 and CN4 to the places.
(5) Place the ground wire terminal around the connecting position, then close the side
cover. When closing the cover, be sure not to pinch the wires.
(6) Be sure to connect the ground wire terminal to the ground wire connecting position.
(7)
Check if IJP starts up properly by turning power ON. If CN1 and CN3 on EZJ139 board are
connected wrongly, the screen display can not be lit up. In this case, check if those connectors
are connected properly or not.
[Inside of side cover]
CN4
CN3
CN1
CN2
EZJ139
When turn main power switch ON, be sure to connect the ground wire.
Caution against an electric shock
Ground wire connecting
position
Board fixing plate mount
Summary of Contents for UX Twin Nozzle
Page 1: ...Service Manual HITACHI Printer UX Twin Nozzle Model Revision February 2017 Version A ...
Page 106: ...3 30 Circuit diagram of EZJ127A board ...
Page 123: ...3 47 Circuit diagram of EZJ129 board ...
Page 131: ...3 55 3 3 20 Electrical Connection Diagram ...
Page 151: ...4 17 7 Reset the time of the replaced solenoid to 0 on the Parts usage time management screen ...
Page 352: ...7 1 7 Attached Drawing 7 1 Circulation System Diagram Circulation System Diagram ...
Page 354: ...7 3 7 3 Electrical Connection Diagram Electrical Connection Diagram ...