
6-35
6.2.21b Pump Motor2 Fault
(*1): When you replace Pump2 motor, refer to “4.8.8 Recovery pump2 motor replacement procedure”.
(*2): When you replace EZJ133 board, refer to
[Replacement procedures of EZJ133 board] in “3.3.1 EZJ133
board (MPU board)”.
[Caution]
Be sure to check that there is no wrong connection of harnesses by referring to
[Connector numbers and
Identifying method of harnesses] in “3.3.20 Electrical Connection Diagram”.
Does the fault recur?
Pump Motor2 Fault
Pull out and insert the connector
・
CN31 of the EZJ133 board
・
CN3 and CN6 of the EZJ138 board
・
pump motor
connector.
Replace the EZJ133 board. *2
Resume the
operation
.
Replace the pump motor2 *1
Does the fault recur?
Yes
No
Yes
No
Does the connection
harness have electrical
continuity?
Replace the connection harness
Does the fault recur?
Yes
No
Yes
No
Summary of Contents for UX Twin Nozzle
Page 1: ...Service Manual HITACHI Printer UX Twin Nozzle Model Revision February 2017 Version A ...
Page 106: ...3 30 Circuit diagram of EZJ127A board ...
Page 123: ...3 47 Circuit diagram of EZJ129 board ...
Page 131: ...3 55 3 3 20 Electrical Connection Diagram ...
Page 151: ...4 17 7 Reset the time of the replaced solenoid to 0 on the Parts usage time management screen ...
Page 352: ...7 1 7 Attached Drawing 7 1 Circulation System Diagram Circulation System Diagram ...
Page 354: ...7 3 7 3 Electrical Connection Diagram Electrical Connection Diagram ...