![Highlight Synergy 0.5 Operation Manual Download Page 15](http://html1.mh-extra.com/html/highlight/synergy-0-5/synergy-0-5_operation-manual_2130600015.webp)
Installation & Adjustments
Synergy 0.5 Turntable Stretch Wrapper Operation Manual
Highlight Industries, Inc. ● 2694 Prairie SW, Wyoming, Mi 49519 ● 1-800-531-2465
14
Unpacking and Moving the Machine
It is very important to read all instructions before undertaking any of these steps. The
following steps should help achieving a safe and quick machine set-up.
1. Place the skidded machine close to the designated wrap area. Remove all shipping
fasteners holding the machine to the pallet.
2. Place the forks of the forklift through the tubes provided on the base of the machine,
remove the machine from the shipping skids, and place it in the designated wrap
area.
Warning!
It is very important that the machine be leveled. Uneven floors will cause
premature turntable support roller failure.
Power and Control Wiring Checks
1. Using a volt meter, check the AC voltage coming to the machine and insure the
proper voltage is present.
2. Plug the machine in and turn the Power Switch ON. Power should now be applied to
the AC frequency drives.
Machine Set-Up