Maintenance schedule
11
73
Item
Procedure
Heat exchanger
(3) Clean the heat exchange pipes with
the boiler brushes (17).Here the
ventilator can also be switched on in
order to suck away any dust forming
in the air. This can simply be carried
out in the Unit Off (1) condition in the
so-called aggregate test.(Parameter
A04
– ID Fan)
After cleaning
- Set the turbulators correctly again,
- Put on the cleaning cover, tighten
the closing screws and
- Install the boiler casing
The accumulated ash should be removed
via the ash door.
Conduct function test of heat exchanger
using the aggregate test.
Remove
deposit
and
check
heat
exchanger visually for damages and
wear.
Burning chamber
Expansion cracks at insulating plates,
respectively burning chamber stones,
don´t affect their capacities and don´t
represent warranty claim.
During cleaning ensure that the slot
between the burner plates is not clogged
(see picture below).On the burner plates
themselves, an ash layer of about 5 cm
can be left which is provided for glow
sustainment.
Attention:
The combustion chamber must always
be cleaned last, as the ash may fall in the
burn-off areas when cleaning the heat
exchanger pipes.
6
5
Summary of Contents for firestar de Luxe 18
Page 1: ...OPERATING INSTRUCTIONS Log wood boiler firestar de Luxe 18 40 ...
Page 80: ...16 Annex 80 16 ANNEX 16 1 Additional boiler module Hydraulic recommendation 1 ...
Page 81: ...Annex 16 81 Hydraulic recommendation 2 ...
Page 82: ...16 Annex 82 16 2 Solar module Program 1 ...
Page 83: ...Annex 16 83 Program 2 ...
Page 84: ...16 Annex 84 Program 3 ...
Page 85: ...Annex 16 85 Program 4 ...
Page 86: ...16 Annex 86 Program 5 ...
Page 87: ...Annex 16 87 Program 6 ...
Page 88: ...17 Notes 88 17 NOTES ...
Page 89: ...Notes 17 89 ...