42
Henrad CC FF
- Installation
66 PRINTED CIRCUIT BOARD REPLACEMENT
67 HW EXPANSION VESSEL
SER
VICING
SERVICING
The CC FF uses:
PCB 37 - Ignition sequence
PCB 40 - Logic sequence
Fan speed control
1. Isolate the electrical supply.
Refer to Frame 54.
2. Remove the front panel.
3. Remove the PCB cover
4. Disconnect all 'Molex' plugs
feeding the PCB to be
changed.
5. Release the clips and
remove the PCB.
6. Fit the new board onto the
clips.
7. Replace all 'Molex'
connectors. Note that the
connectors are made non-
interchangeable. If in doubt,
refer to Frame 40 - Pictorial
Wiring.
8. Re-assemble in reverse
order
9. Test both DHW and CH
modes of operation.
1. Disconnect the electrical supply
to the boiler.
2. Remove the front and sealing
panels. Refer to Frame 48.
3. Close the isolating valve on the
HW supply then release
pressure by opening a hot tap.
Note.
Ensure valve markings
are as shown.
4. Drain, using the drain point on
the isolating valve.
5. Unscrew the HW expansion
vessel, which may be finger-
tight. If necessary, remove the
fan (see Frame 65). To access
use a spanner on the hexagon
nut behind the vessel.
6. Replace with new sealing
gasket and vessel.
Reassemble in reverse order
and test fire.
Summary of Contents for CC 100 FF
Page 1: ......