23
Henrad CC FF
- Installation
27 MOUNTING THE BOILER
28
CONNECTING THE TURRET TO THE BOILER
3. Drill a 3.2mm hole through the flue via the hole already
present in the turret. Secure the turret to the flue, using
the self tapping screw provided.
1. Mate the turret to the flue.
2. Secure the flue turret on top of the boiler by inserting the
open ends of the turret clamp under the 2 studs and fixing
it in the middle with the single M5 x 10mm pozi-hex screw
provided.
4. Flues over 1 metre long
Fix the flue support bracket
to the wall, using the wall
plug and wood screw.
•
For standard
installations use the
short wood screw.
•
If the 'stand-off' option
is used secure the
support bracket, using
the spacer bracket and
long wood screw.
INSTALLATION
SIDE FLUE OUTLET
1. The boiler may be prewired to the loose electrical
connector and secured with the cable clamps. Refer
to Frame 39.
2.
WARNING: Ensure that the plastic plugs are
removed from both the DHW and CH pipes before
mounting.
N.B. Some spillage of water may occur from the
pipework when mounting the boiler to the frame.
3. Lift the boiler onto the wall mounting frame, locating
it over the tabs at the top of the frame.
4. Lower the boiler into position.
5. Remove the bottom panel to access service
connections.
6. CC 80 FF only. Fit the filter to the DHW inlet valve, as
shown.
CC 100 FF/120FF only. Refer to Frame 6.
7. Using the correctly sized fibre washers supplied in
the hardware pack, engage and then tighten the 4
water unions.
8. Engage and tighten the gas union.
9. Fix the pipe and fibre washer to the safety drain
outlet which is supplied in the boiler hardware pack.
Summary of Contents for CC 100 FF
Page 1: ......