12
Henrad CC FF
- Installation
7
BOILER ASSEMBLY - Exploded View
INSTALLATION
INST
ALLA
TION
LEGEND
A.
Gas injection pipe.
B.
Pressure gauge sub assy.
C.
Flue outlet elbow
D.
Wall mounting plate
E.
Flow restrictor
1.
Main burner
2.
Main burner injector
3.
Gas valve
4.
Flame sensing electrode
5.
Ignition electrode
7.
PCB 37
8.
PCB 40
24. Pump.
25. DHW Flow switch.
26. Automatic air vent.
27. Heat exchanger.
28. Pressure sensing pipe.
29.
30. EMC filter.
32. CH Return pipe assy.
33. Pump pipe assy.
34. CH Lower flow pipe assy.
35. CH Upper flow pipe assy.
36. DHW Upper cold pipe assy.
37. DHW Upper hot pipe
assy.
38. DHW Lower cold pipe
assy.
39. DHW Lower hot pipe
assy.
40. Boiler front panel.
41. Sealing panel
44. Tank cover assy
45. Controls door assy.
59. Turret clamp.
67. Transformer.
9.
PCB 8: Fan speed controller.
11. Boiler overheat t'stat.
12. Water pressure switch.
13. DHW O/heat 'stat.
14. DHW sensor.
15. Potentiometer harness.
16. Potentiometer knob
17. Pressure gauge.
19. Fan assembly.
21. Pressure relief valve.
22. DHW expansion vessel
23. CH expansion vessel
Summary of Contents for CC 100 FF
Page 1: ......