
4
Henrad CC FF
- Installation
CC 80 FF (Natural gas)
G.C. Appliance No. ........ 47 348 11
B.G. Certified - P.I. No. ........ 87 AS 93
CC 100 FF (Natural gas)
G.C. Appliance No. ........ 47 348 12
B.G. Certified - P.I. No. ........ 87 AT 20
CC 120 FF (Natural gas)
G.C. Appliance No. ........ 47 348 13
B.G. Certified - P.I. No. ........ 87 AS 94
INTRODUCTION
CC FF combi boilers are wall mounted, low water content, fanned
flue combination gas boilers of type C
13
intended for use with gas
group I2
H.
Central heating (CH) output modulates between 11.7 kW (40,000
Btu/h) minimum and 23.4 kW (80,000 Btu/h) maximum for CC 100/
120 FF and 17.6kW (60 000Btu/h) maximum for CC 80 FF.
Domestic hot water (DHW) output is also fully modulating, with a
maximum of:
CC 80 FF
23.4 kW
(80,000 Btu/h)
CC 100 FF
29.3 kW
(100,000 Btu/h)
CC 120 FF
35.2 kW
(120,000 Btu/h)
The boiler is suitable for connection to fully pumped, pressurised
sealed water systems ONLY.
A system bypass is only required when TRV's are fitted to all
radiators (see Frame 5).
Boilers are supplied fully assembled and, being a 'tube-within-
tube' design, require no diverter valve or domestic hot water calorifier.
A circulating pump, pressure gauge, safety valve and expansion
vessels for both central heating (CH) and domestic hot water (DHW)
are provided.
The CH flow temperature is controlled by an electronic thermostat.
In DHW mode the boiler modulates to sustain a nominal adjustable
water flow temperature of 60
o
C.
The boiler casing is of white painted mild steel with a drop-down
controls access door.
The boiler temperature control is located behind the controls access
door.
The heat exchanger is made of copper and cast iron.
The system pipework must include drain cocks in appropriate
places. Pipework may be taken downwards or upwards behind
the boiler (using the stand-off channels).
OPTIONAL EXTRA KITS
Timer Kit
- fits neatly within the casing. Separate fitting
instructions are included with the kit.
Note.
If using an alternative timer read Frame 42 first.
Extension Ducts
Roof Flue Kit
90
o
Elbow Kit
45
o
Elbow Kit
Note.
When ordering a Roof Flue Kit a flue adaptor must be
used.
Destination Countries: GB and IE.
CONTENTS
Air Supply ....................................................................... 7
Boiler Dimensions/Clearances ..................................... 6
Boiler Exploded Diagram ............................................ 12
Commissioning and Testing ....................................... 30
Electrical Connections ................................................ 28
Electrical Diagrams ..................................................... 28
Electrical Supply Requirements ................................... 9
Extension Ducts - Fitting ............................................. 25
Fault Finding ................................................................. 49
Flow Wiring Diagram ................................................... 28
Flue Fitting
Rear outlet .............................................................. 15
Side outlet .............................................................. 20
Flue Installation Requirements ..................................... 8
Gas Safety ...................................................................... 7
Gas Supply Requirements ............................................ 8
Initial Lighting ............................................................... 31
Installation ................................................................... 12
Mandatory Requirements ............................................. 7
Sealed System Requirements ...................................... 9
Servicing ...................................................................... 33
Short List of Parts ....................................................... 60
Terminal Guards ............................................................ 8
Thermostatic Radiator valves ...................................... 9
Unpacking .................................................................... 13
Water and Systems ...................................................... 8
Water Connections ...................................................... 6
Water Treatment ........................................................... 9
Wiring Diagrams .......................................................... 28
NOTE TO THE INSTALLER: LEAVE THESE
INSTRUCTIONS ADJACENT TO THE GAS METER.
ALSO COMPLETE THE BENCHMARK LOG BOOK
AND GIVE THIS TO THE CUSTOMER.
Data badge: top RH controls channel
Summary of Contents for CC 100 FF
Page 1: ......