
18
Henrad CC FF
- Installation
18 CONNECTING THE TURRET TO THE BOILER
1. Mate the turret to the flue.
2. Secure the flue turret on top of the
boiler by inserting the open ends of
the turret clamp under the 2 studs
and fixing it in the middle with the
single M5 x 10mm pozi-hex screw
provided.
3. Drill a 3.2mm hole through the flue
via the hole already present in the
turret. Secure the turret to the flue,
using the self tapping screw
provided.
17 MOUNTING THE BOILER
1. The boiler may be prewired to the loose electrical
connector and secured with the cable clamps. Refer to
Frame 39.
2.
WARNING: Ensure that the plastic plugs are removed
from both the DHW and CH pipes before mounting.
N.B. Some spillage of water may occur from the
pipework when mounting the boiler to the frame.
3. Lift the boiler onto the wall mounting frame,
locating it over the tabs at the top of the frame.
4. Lower the boiler into position.
5. Remove the bottom panel to access service
connections.
6. CC 80 FF only. Fit the filter to the DHW
inlet valve, as shown.
CC 100 FF/120 FF only. Refer to Frame
6.
7. Using the correctly sized fibre washers
supplied in the hardware pack, engage
then tighten the 4 water unions.
8. Engage and tighten the gas union.
9. Fix the pipe and fibre washer to the
safety drain outlet which is supplied in
the boiler hardware pack.
REAR FLUE OUTLET
INSTALLATION
Summary of Contents for CC 100 FF
Page 1: ......