14 FITTING THE WALL MOUNTING FRAME
Showing the use of 'stand-off' channels,
to enable upward pipework.
INSTALLATION
REAR FLUE OUTLET
Make service water, gas & electrical connections. Go to Frames 35, 36 & 39 then return to Frame 15.
Fit the wall mounting frame either:
a. Directly to the wall
!
!
!
!
!
Insert wall plugs.
!
!
!
!
!
Put the screws into the wall plugs and leave 10mm proud
!
!
!
!
!
Hang the frame onto the screws and tighten up.
or
b. Use stand-off channels
(To allow pipework to be taken upwards).
!
!
!
!
!
Insert wall plugs.
!
!
!
!
!
Put the screws into the wall plugs and leave 10mm proud.
!
!
!
!
!
Fasten each channel to the frame with the 6mm screws
provided.
!
!
!
!
!
Hang the channels and frame onto the screws and tighten
up.
Note.
If the clearances above and below the boiler are less
than the length of the pipes it will be necessary to position the
pipes behind the wall mounting plate BEFORE the plate is
screwed to the wall.