
Functions of the room- and radio components
S. 83
Fig.: 62: Installation heatapp! floor
11.5.1
Installation (hat rail mounting) of heatapp! floor
1.
Place the
heatapp! floor
on the top hat rail
2.
Engage the hooks by pressing down gently.
11.5.2
Antenna
1.
Ensure that subsequently the aerial can be installed outside the distribution box of the underfloor heating
system.Schließen Sie die Antenne (4) mit dem Antennenstecker an den Antennenanschluss (5) am
heatapp! floor
an.
2.
Connect the aerial by means of its plug to the aerial socket on the heatapp! floor.
The length of the aerial cable (about 2 m) means the aerial can be installed in an optimum position.
To determine this, register the
heatapp! floor
with the
heatapp! gateway
, start the connection test and check the wireless
coverage. If it is not possible to establish a connection, change the aerial's position and repeat the process (see chapter
"Including / excuding at heatapp! gateway").
3.
Attach the supplied adhesive strips to the aerial and place it in a suitable mounting place.
11.5.3
Anschluss an 230 V
1.
Connect the thermoelectric actuators of the underfloor heating system (230 V N/C) to the heatapp!
floor according to the terminal assignment.
A
B