29
Flush
3" (7,6 cm)
x2
PARTS REQUIRED:
10' GABLE WALL 02 INSTALLATION
3" (7,6 cm)
x10
2" (5,1 cm)
x23
3"
(7,6 cm)
Nails
Center 10' wall on the 120" (304,8 cm) floor dimension.
1" (2,5 cm) overlap is to the bottom.
OO
BEGIN
1
1"
(2,5 cm)
3"
(7,6 cm)
Screws
Secure lower edge of panel to floor frame with 2" nails spaced 6" apart.
Angle nails into floor frame
(Fig. A)
.
Secure wall bottom plates to floor with 3" nails
(Fig. A)
.
2
Your 10' gable wall 02 is now standing.
FINISH
Install
OO
as a temporary brace.
Secure with (2) 3" screws.
6"
(15,2 cm)
DOOR
DOOR
Nail 2" nails first.
2" (
5,1 cm)
Nails
3"
(7,6 cm)
Nails
Fig. A
OO
x1
69" (175,3 cm) Door Stiffener
Temporary Brace