53
PARTS REQUIRED:
GABLE TRIM
x88
2" (5,1 cm)
Your gable trim is now installed.
Install upper gable trim
BBL
and
BBR
flush to top of roof panels and flush at peak.
Secure trim with 2" finish nails evenly spaced, as shown.
Install (2) lower gable trim
AHC
flush to top of roof panels and flush to installed trim.
Secure trim with 2" finish nails evenly spaced, as shown.
BEGIN
1
2
2" (5,1 cm)
Finishing Nails
2" (5,1 cm)
Finishing Nails
AHC
AHC
AHC
AHC
BBL
BBL
BBR
BBR
Flush to
roof panel
Flush to
roof panel
Flush to
roof panel
Flush to
roof panel
Repeat steps to install trim to the back gable.
FINISH
Flush
Flush
Flush
Flush
Flush at peak
Flush at peak
19/32" x 3-1/2 x 40-3/16" (1,5 x 8,9 x 102,1 cm)
AHC
x4
19/32" x 3-1/2 x 48-3/8" (1,5 x 8,9 x 122,9 cm)
BBR
x2
19/32" x 3-1/2 x 48-3/8" (1,5 x 8,9 x 122,9 cm)
BBL
x2