32
10' GABLE WALL 01 INSTALLATION
3" (7,6 cm)
x2
3" (7,6 cm)
x8
2
Place 10' gable wall on floor centered between
installed' walls.
Secure wall with 2" screws into top and bottom plates
(Fig. A, Fig. B)
.
Secure wall to bottom plate first.
BEGIN
1
Nail lower edge of panels to floor
with 2" nails spaced 6" apart.
Angle nails into floor frame
(Fig. C)
.
Nail panels to eave wall studs with
1-1/2" nails spaced 6" apart.
ENSURE PANEL CORNERS ARE FLUSH.
Your walls are now installed.
FINISH
2" (5,1 cm)
x10
1-1/2" (3,8 cm)
x26
2" (5,1 cm)
x4
PARTS REQUIRED
Secure wall top plates with 3" screws
at each corner at an angle
(Fig. D)
.
3
2" (5,1 cm)
Screw
Flush
Flush
Fig. A
Fig. B
6"
(15,2 cm)
2" (5,1 cm)
Nails
1-1/2"
(3,8 cm)
Nails
6"
(15,2 cm)
3" (7,6 cm)
Screw
Fig. D
3" (7,6 cm)
Nails
Nail 2" nails first.
2" (5,1 cm)
Nails
Fig. C
3" (7,6 cm)
Nails
CONTINUE TO PAGE 37 TO CONTINUE
BUILDING YOUR SHED.
Cut out and remove bottom plate
at door opening.
2"
(5,1 cm)
Screw