57
Center doors on mark
(Fig. B).
Remove temporary support
OO
and check to make sure doors open and close properly.
FINISH
Your doors are now installed.
Center 3/8" measurement
on mark.
3/8"
(1 cm)
Fig. B
3" (7,6 cm)
x12
Flush
against wall panels
Fig. A
OO
PARTS REQUIRED:
DOORS
2
3
Screw hinge boards into wall supports with (10) 3" screws, as shown.
Make sure screws go into framing
.
4
Install
OO
flush under panels.
Secure to floor frame with (2) 3" screws
(Fig. A)
.
Mark center of door opening.
IMPORTANT NOTE:
You may need to lower and level OO
so that doors will fit under gable panels.
OO
x1
69" (175,3 cm) Door Stiffener
(5) 3" (7,6 cm)
Screws
in door stud
(2) 3" (7,6 cm) Screws
OO
TEMPORARY SUPPORT
TEMPORARY SUPPORT