
44
FRONT GABLE UNIT INSTALLATION
PARTS REQUIRED:
2" (5,1 cm)
x57
x4
3" (7,6 cm)
6"
(15,2 cm)
2
1
BEGIN
Your front gable unit is now installed.
FIB
NAIL FIRST
2" (5,1 cm)
NAIL FIRST
2" (5,1 cm)
DOUBLER
3"
(7,6 cm)
Measure and
Mark
3"
(7,6 cm)
Measure and
Mark
Continue securing panels to wall doubler, top plate and rafter with 2" nails spaced 6" apart.
Working inside, secure gable unit with (2) 3" screws angled into each
FIB
at an angle
(Fig. A)
.
Measure 3" (7,6 cm) down from top plate doubler and mark at each side as shown.
Set front gable unit centered on front wall doubler. Fasten with (1) 2" nail on each side.
BE SURE GABLE IS CENTERED ON WALL BEFORE NAILING.
FINISH
Pre - assembled
Fig. A
3"
(7,6 cm)
Screws