21
3/4" Gauge
Block
3/4" Gauge
Block
Install (2)
15-7/8" x 72"
panels flush
to the top plate and flush
along the edge of door
frame, as shown.
Secure panel with 2" nails
spaced 6" apart
on edges.
Note the panel
lip-edge/square edge
orientation.
Ensure 64" (162,8 cm) door
measurement.
Use part
OO
as a
temporary brace. Secure
with with (2) 3" screws.
PARTS REQUIRED:
GABLE WALL 01 WITH DOOR
2" (5,1 cm)
x116
6"
(15,2 cm)
BEGIN HERE
3/4"
(1,9 cm)
Flush
Flush
OO
Temporary Brace
3" (7,6 cm)
x2
2
64"
(162,6 cm)
3"
(7,6 cm)
Screw
3"
(7,6 cm)
Screw
3/4"
(1,9 cm)
x1
69" (75,3 cm) Door Stiffener
OO
Temporary Brace
Install the left and right
11-7/8" x 72"
panels
flush panels flush
to the top plate and flush
to installed panels.
Secure panels with 2"
nails spaced 6" apart
on edges.
Note the panel
lip-edge/square edge
orientation.
Flush
Flush
Flush
Flush
3
Your gable wall 01 with
door is now assembled.
Carefully flip the wall over.
FINISH
LIP EDGE
LIP EDGE
LIP EDGE
11-7/8"
(40,3 cm)
15-7/8"
(30,2 cm)
SQUARE
EDGE
SQUARE
EDGE
SQUARE
EDGE
SQUARE
EDGE
SQUARE
EDGE
6"
(15,2 cm)
Flush
x2
3/8 x 15-7/8 x 72"
(1 x 40,3 x 182,9 cm)
x1
Right
SQUARE
EDGE
SQUARE
EDGE
3/8 x 11-7/8 x 72"
(1 x 30,2 x 182,9 cm)
3/8 x 11-7/8 x 72"
(1 x 30,2 x 182,9 cm)
x1
Left
LIP EDGE
SQUARE
EDGE