42
FRONT GABLE UNIT
PARTS REQUIRED:
Flush
Flush
2
Arrange front gable parts
FIB
on the flat side, as shown.
Measure and mark the center of the middle gable panel. Secure with 1-1/2" nails spaced 6" apart along edge.
Place end panels on
FIB
flush to installed panel and secure with 1-1/2" nails spaced 6" apart along edge.
Repeat step 2 for right panel.
1
BEGIN
1-1/2" (3,8cm)
x24
Install gable panels with the primed side facing up.
Mark
Your front gable unit is now assembled.
FINISH
6"
(15,2 cm)
1-1/2"
(3,8 cm)
Nails
6"
(15,2 cm)
1-3/4"
(4,4 cm)
1-3/4"
(4,4 cm)
1-1/2"
(3,8 cm)
1-1/2"
(3,8 cm)
Nails
x1
x1
x1
2 x 4 x 41-11/16" (5,1 x 10,2 x 105,9 cm)
FIB
x2
FIB