41
10-1/8"
(25,7 mm)
Install trim on primed side of panel.
3
2
Set
27-3/8" x 50-13/16"
gable center
panel (primed side facing up) on top of
(2)
OO
, as shown.
Measure and mark the 12" (30,5 cm)
center of the gable panel and
10-1/8" (25,7 cm) from bottom of panel.
Arrange trim parts as shown, with all
connections flush.
Secure with (2) 2" finishing nails
in each part.
Turn the panel over (with trim attached).
Secure each part with 3/4" screws
between nails, as shown.
Snip off the protruding nails.
You are finished with the
temporary supports.
Set them aside.
1
BEGIN
1
BEGIN
Your gable panel with hay loft trim is now assembled.
FINISH
2"
(5,1 cm)
Finishing Nails
3/4"
(19 mm)
Screws
PARTS REQUIRED:
FRONT GABLE HAY LOFT TRIM
3/4" (19 mm)
x20
2" (5,1 cm)
x14
Center
Temporary Support
Flush all
connections
KX
x4
19/32" x 2-1/2" X 21-3/4" (1,6 x 7,6 x 55,2 cm)
x2
19/32" x 2-1/2" x 12-7/8" (1,6 x 7,6 x 32,7 cm)
JGA
x1 LKA
19/32" x 2-1/2" x 25-3/4" (1,6 x 7,6 x 65,4 cm)
12"
(30,5 mm)
12"
(30,5 mm)
OO
JGA
JGA
KX
KX
KX
KX
LKA
OO
x1
69" (175,3 cm) Door Stiffener
Temporary Brace
x1
23-7/8" x 50-13/16"
(60,6 x 129,1 cm)
27-3/8" x 50-13/16"