43
BACK GABLE UNIT INSTALLATION
PARTS REQUIRED:
2" (5,1 cm)
x57
x4
3" (7,6 cm)
6"
(15,2 cm)
2
1
BEGIN
Your back gable unit is now installed.
GPP
NAIL FIRST
2" (5,1 cm)
NAIL FIRST
2" (5,1 cm)
1-1/2"
(3,8 cm)
Measure and
Mark
1-1/2"
(3,8 cm)
Measure and
Mark
Continue securing panels to top plate and rafter with 2" nails spaced 6" apart.
Working inside, secure gable unit with (2) 3" screws angled into each
GPP
at an angle
(Fig. A)
.
Measure 1-1/2" (3,8 cm) down from top plate and mark at each side as shown.
Set back gable unit centered on back wall top plate. Fasten with (1) 2" nail on each side.
BE SURE GABLE IS CENTERED ON WALL BEFORE NAILING.
FINISH
Pre - assembled
Fig. A
3"
(7,6 cm)
Screws
Top Plate