12x8 Groundsman

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All building’s should be 

erected by two adults

For ease of assembly, you 

MUST

 pilot drill all screw 

holes and ensure all screw 

heads are countersunk.

For assistance please contact customer care on: 01636 880514

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces of the 

timber.  You are strongly advised to wear gloves 

when working with or handling rough sawn 

timber.

**Protim Aquatan T5 (621)**

Your building has been treated with 

Aquatan

.

Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct 

application of Aquatan solution and then allowed to dry.

Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels and 

garden buildings.

Aquatan 

undiluted

 contains:

 boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl 

sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.

Please retain product label and instructions for future reference

             

General Instructions

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) 

including  a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm 

bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather conditions. 

For the duration of heavy or extended periods of rain, swelling of the wood panels may 

occur. Warping of the wood may also occur during excessive dry spells due to an interior 

moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is 

suggested that the outdoor building is sprayed with water during extended periods of 

warm sunshine and sheltered as much as possible during rain or snow. 

Our buildings are pre treated with a water based treatment**; this only helps to protect 

the product during transit and for upto 3 months against mould.  To validate your 

guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated 

with a wood preserver within the first three months of assembly and thereafter in 

accordance with the manufactures recommendations.  Care must be taken to ensure 

the product is placed on a suitable base.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to 

diagrams for the base dimensions,  The base should be slightly smaller than the external 

measurement of the building, i.e. The cladding should overlap the base, creating a run 

off for water. It is also recommended that the floor be at least 25mm above the 

surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in 

the case of childrens products independently tested to EN71 level, we cannot accept 

responsibility for your safety whilst erecting or using this product.

Refer to the instructions pages for you specific product code

For ease of assembly, you 

will need a tape measure to 

check dimensions of 

components.

Summary of Contents for 12x8 Groundsman

Page 1: ...ns For the duration of heavy or extended periods of rain swelling of the wood panels may occur Warping of the wood may also occur during excessive dry spells due to an interior moisture loss Unfortunately these processes cannot be avoided but can be helped It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered as much as possible duri...

Page 2: ...ow Panel x2 Roof Panel x4 Plain Panel x2 Roof Truss Window x2 Floor x2 Door x2 Fixing Kit Facias 95x1480mm x4 Cover trims 55x1652mm x6 Shed Diamond Finial x2 Felt Truss Support 45x100mm x2 Facia Blocks 27x44x120mm x4 Tower Bolt Block 12x44x120mm 1244 1449mm Horizontal Door Strip 1244 1732mm Vertical Door Strip x2 Window Strip 1055mm x2 22 T Hinge 23 Butt Hinge x4 25 Nail Bag Casement Stay x2 132x3...

Page 3: ... to the Window Strip and 16mm screws to fix it to the Opening Window If you want to fix the opening windows instead of fixing butt hinges to the opening window use 4x30mm screws to attach the opening windows to the window panel as shown in the diagram SCREW COUNT PER WINDOW 19 25 9 9 Fix the door strips onto the front gable using 4x30mm screws for each strip Fix the T Hinges onto the doors and doo...

Page 4: ...s are flush to each other and fix using 10x50mm screws Alternate fixing positions along the length of the floors Step 3 Do not secure the building to the floor until the roof is fitted Fix the panels onto the floor using 50mm screws in align ment with the floor joists Fix the corners with 50mm screws as shown in diagram Position the panels so there is equal spacing between the floor and cladding o...

Page 5: ...with x2 70mm Screws Step 6 Fix the roof panels on either side as shown in diagram Ensure roof framing fits into slot at top between the gable top rafters and the roof truss Fix panels into position using 30x 30mm screws from the top of panel straight into the rafter and roof truss Pre drill holes before hand Ensure the larger over hang on both panels are facing each other at the top point 40x 30mm...

Page 6: ...a block fascia and Shed Diamond 4 4 1 13 10 18x 40mm Screws 15 15 Step 10 To fix the lock in place Screw the Staple to the Door Gable or Slave door Making sure the Hasp is in line with the staple and screw into the Door or Master door To lock the Door place the Hasp over the Staple and twist into the lock position as shown 8x30mm screws Pre drill hole 30mm screw 30mm screw Pre drill hole 19 Place ...