Assembly Instruction Manual

ABSCO PREMIER SHED

MODEL: 23232GK

2.26mW x 2.26mD x 2.10mH

Model: 23232GK

1.20

1  

 

 

17/06/19

Download the Absco 

Sheds Assembly App 

for instructional videos 

MANUFACTURED

IN AUSTRALIA

SNAPTiTE

Assembly

AU: 1800 029 70

1

NZ: 0800 466 444

[email protected]

www.abscosheds.com.au

CONC

RETE

 SLAB

 

2360mm (7’9”)

2360mm (7’9”)

When laying concrete slab, ensure there 

is  a  rebated  edge  25mm  deep  around 

the perimeter. This will help water egress 

from the base of the shed.

ABSCO INDUSTRIES

ASSEMBLY INSTRUCTION MANUAL

SHED MODEL: 23151GK 

21-11-2017  

      

CONCRETE SLAB

2360mm

1620mm

FRONT:   2.26m

SIDE:       1.52m

HEIGHT:  1.95m

We thank you for choosing an Australian made

shed. For further assistance please visit our detailed

instructional video library at

Http://www.abscosheds.com.au/watch-videos

At ABSCO Industries we are always looking to be

number ONE, so please let us know what you think

of our instructions. Feedback makes us better.

[email protected]

CONCRETE 

REBATED EDGE

BOTTOM CHANNEL

CONCRETE SLAB

75mm WIDE REBATE

100mm

WHEN LAYING YOUR CONCRETE

SLAB, ENSURE THERE IS A

REBATED EDGE 25mm DEEP

AROUND THE PERIMETER

THIS WILL HELP WATER EGRESS

FROM THE BASE OF THE SHED

Absco Industries

Premier Shed Model: 23151GK

PAGE 01

For construction in non-cyclonic areas

Wind rating: N2 as per AS4055-2012.

If you require a higher wind rating please contact 

us: [email protected] or 1800 029 701

NOTE:  This  shed  can  be  upgraded  to  wind 

rating: C1 as per AS4055-2012 with the additional 

purchase of a Cyclone Kit.

日本改定日2021/4/30

Summary of Contents for 23232GK

Page 1: ...tralian made shed For further assistance please visit our detailed instructional video library at Http www abscosheds com au watch videos At ABSCO Industries we are always looking to be number ONE so please let us know what you think of our instructions Feedback makes us better feedback absco com au CONCRETE REBATED EDGE BOTTOM CHANNEL CONCRETE SLAB 75mm WIDE REBATE 100mm WHEN LAYING YOUR CONCRETE...

Page 2: ...r the shed must be level An uneven surface may result in misalignment of parts The shed shall be erected on top of a reinforced concrete slab and anchored down appropriately illustrated on FINAL CONSTRUCTION page TOOLS REQUIRED SAFETY NOTES Some parts may have sharp edges It is advisable to wear gloves when handling these items and safety glasses if drilling holes Sensible shoes are highly recomme...

Page 3: ...1785x773mm SNAPTiTE SHEET STRAIGHT 1725x773mm SNAPTiTE SHEET STRAIGHT 1725x773mm SNAPTiTE SHEET STRAIGHT 1170x773mm SNAPTiTE SHEET LEFT ANGL E 1915x773mm SNAPTiTE SHEET RIGHT ANGLE 1915x773mm SNAPTiTE SHEET PEAK 1980x773mm SNAPTiTE SHEET S PERFORATED PAIR 1785x329mm 2 2 1 1 1 1 1 6 RIDGE BEAM 1152mm LONG SPLICED PEAK BRACE 450mm LONG 2 2 RIDGE BEAM JOINER 450mm LONG 1 1 23232G CHANNEL PACK 23232GC...

Page 4: ...END CHANNEL 1126 5mm NOTCHED ONE END CHANNEL 1126 5mm STRAIGHT CHANNEL 1126 5mm STRAIGHT CHANNEL 1126 5mm NOTCHED ONE END CHANNEL 1126 5mm NOTCHED ONE END CHANNEL 1725mm STRAIGHT HINGES CHANNEL 773mm STRAIGHT CHANNEL 1143mm STRAIGHT CHANNEL 1143mm STRAIGHT CHANNEL STRAIGHT JAMB 1785mm NOTCHED BOTH ENDS JAMB 1725mm STRAIGHT JAMB NOTCHED BOTH ENDS JAMB 1120mm STRAIGHT 1 1 1 1 1 1 2 2 2 2 4 4 1 STRAI...

Page 5: ...1 PHILLIPS HEAD DRIVER BIT S2 PH2 FAST038 1 8G x 3 8 SELF TAPPING SCREWS x 220 PACK220 PACK12P SCREW PACK 12 12 SBS43E POP RIVET FAST009 12 3 16 x 1 2 COUNTERSUN K SCREW NUT FAST004 FAST00 5 8 3 16 x 1 2 PAN HEAD SCREW FAST002 8 3 16 NYLOCK NUT FAST00 3 Check off all components INSTRUCTIONS FITTINGS PAC K CHANNEL JOINER 200mm LONG ZACSJ DOOR PLATE 165mm CO12A WAFER TEK SCREW CL3 10 16x16mm FAST014...

Page 6: ... order to split the sheet lay it on the ground and lift and fold one end until the perforations have cleanly snapped Discard the middle piece as scrap when convenient Fold the scrap piece in half two or three times and throw in garbage Check sheet for perforations Fold first side of sheet until free Fold middle section of sheet until free Discard middle piece SCRAP SCRAP SCRAP S CR AP SCRAP SCRAP S...

Page 7: ...he channel along the sheets until each end is neatly flush If you need to remove channels from the panels slide it off from the side Channel locks the shed panel into position without the need for screws FASTENING SYMBOLS Secure channel to sheeting by SNAPTiTE fastening method Join components together with one screw at this location only as some channels have extra holes that are not required for t...

Page 8: ...end of the channel where the JOIN text is marked Push down one side of the CSJ until you hear a click Step 3 Join the second channel to the CSJ by positioning the JOIN of the channel at the centre of the CSJ on an angle Push the CSJ into the channel until you hear a click Finished Channel The joined channels should now look like the picture with the CSJ positioned equally inside of the joined chan...

Page 9: ...may have holes in them You will need to redrill holes where CSJ joining channel covers them Join together 20 x channel sections using 10 x channel joiners Part CSJ 4 X 81CR 2253mm 2 x 60B 4 x 81C 1 x 54B 81CL 81CR 60BR 60BL 2 X 60BR 2 X 60BL 4 X 81CL 1 X 54BR 1 X 54BL 54BR 54BL 81DR 81DL 1 x 81D 1 X 81DR 1 X 81DL 1 X 54LR 1 X 54LL 1 X 54KR 1 X 54KL 54LR 54LL 54KR 54KL 1 x 54K 1 x 54L ...

Page 10: ...a 50mm overlap of the ridge caps when the beams are in position Step 2 Use the ZARSP to connect at the centre of the two ridge beams Be sure it is pushed in fully Step 3 Turn over the ridge beam Measure 250mm from the middle along the centre of one ridge beam mark spacings of 50mm Fasten with a Tek screw at each marking Repeat to the other side of the ridge beam assembly TIP Predrilling each hole ...

Page 11: ...bly Instruction Manual ABSCO PREMIER SHED MODEL 23232GK 2 26mW x 2 26mD x 2 10mH Model 23232GK 1 20 11 17 06 19 PRE ASSEMBLY OF SPLICED RIDGE BEAM 1x 97BL 1x 97BR 1x 97B 2253mm Overall length ZARSP 225mm 97BL 97BR 16mm 16mm ...

Page 12: ...Instruction Manual ABSCO PREMIER SHED MODEL 23232GK 2 26mW x 2 26mD x 2 10mH Model 23232GK 1 20 12 17 06 19 OVERVIEW OF ROOF COMPONENTS OVERVIEW OF ROOF COMPONENTS 86A 60B 14A 86A 81C 86A 86A 14A 81C 97B 49A 49A 49A 49A 49A 49A ...

Page 13: ... SHED MODEL 23232GK 2 26mW x 2 26mD x 2 10mH Model 23232GK 1 20 13 17 06 19 OVERVIEW OF WALL COMPONENTS 81C 83L 54B 83R 83L 15A 54K 30A 30A 31A 81D 81C 36L 42D 36R 39B A B 79E 54L 89A 89A 83R 90F 36R 42D 36L 39B 36R 36R 36L 36L 31A 30A 30A 39B 39B B A 42D 42D ...

Page 14: ...co Industries Assembly Instruction Manual ABSCO PREMIER SHED MODEL 23232GK 2 26mW x 2 26mD x 2 10mH Model 23232GK 1 20 14 17 06 19 REAR PANEL ASSEMBLY 1x required 30A 31A 30A 54B 81D SNAPT TE i SNAPT TE i ...

Page 15: ...tion Manual ABSCO PREMIER SHED MODEL 23232GK 2 26mW x 2 26mD x 2 10mH Model 23232GK 1 20 15 17 06 19 ROOF PANEL ASSEMBLY 2x required Fit 81C to edge of sheet with pre punched holes 49A 49A 49A SNAPT TE i SNAPT TE i 86A 81C 86A 60B D D ...

Page 16: ...co Industries Assembly Instruction Manual ABSCO PREMIER SHED MODEL 23232GK 2 26mW x 2 26mD x 2 10mH Model 23232GK 1 20 16 17 06 19 SIDE PANEL ASSEMBLY 2x required 36L 42D 36R INSIDE OF SHED 83R 81C 83L 15A ...

Page 17: ...MIER SHED MODEL 23232GK 2 26mW x 2 26mD x 2 10mH Model 23232GK 1 20 17 17 06 19 FRONT PANEL ASSEMBLY 1x required Align holes on 89A jambs 3mm inside this edge of rib on 39B SNAPT TE i SNAPT TE i SNAPT TE i SNAPT TE i 39B 39B 89A 89A D D D D 54K 90F 79E 54L ...

Page 18: ... 20 18 17 06 19 58C 58C 58C 12A 58C 58A 58A A B 89C 58B A B SNAPT TE i SNAPT TE i SNAPT TE i SNAPT TE i Vertical door channels are installed in the opposite orientation compared to the horizontal door channels Four hole set for padbolt connection Short flange of channel Long flange of channel D D D D D D D D 1x required ...

Page 19: ...s are also supplied and may be used instead of rivets Use a 4mm drill bit to enlarge these holes in the jamb NOTE The holes to fasten the padbolt hasp are not pre punched to allow for proper alignment Position the hasp centrally over the padbolt shaft and drill 3mm holes and secure with screws 91A 91A DOOR PANEL ASSEMBLY NOTE Use FAST063 padbolt for the front of Door B ...

Page 20: ...own The top channels of each panel are pre punched for attaching roof sheeting The base channels are not pre punched Side wall channels fit into the notched rear wall channels Pre punched holes in roof panel to this side for connection to front and rear walls Pre punched channel to match ridge beam holes Orient panel so channel 60B goes into ridge beam Channel 81C this end 97B D D D D D D D D D D D...

Page 21: ...2GK 1 20 21 17 06 19 Secure peak brace to ridge beam and roof panel with one screw at each end INSIDE VIEW OF FIXING Move the other roof panel into position and secure peak brace to ridge beam with one screw at each end Slide the roof panel into position and secure with one screw at each corner only at this stage ...

Page 22: ...he wall sheet Drill a 10mm hole into the concrete Bolt and Nut M10 4 6 S Steel Angle 35 x 35 x 3 M10 Dynabolt Denotes hot dip galvanised finish Wall Sheet Slab 14A Bend the top and bottom flanges as shown then hook the bottom flanges under the top channel and screw top to the ridge beam with two screws ANCHORING OF SHED Location of 12 concrete anchors 250 250 250 50 50 250 600 600 600 760 760 760 760...

Page 23: ...the installation contractor Scaling of drawings shall not be undertaken 7 G Prior to commencing works on site the contractor shall verify the position of all services in the area to ensure that the construction does not interfere with any of those services 8 G During installation on site the shed structures shall be maintained in a stable condition with no part becoming overstressed or permanently...

Page 24: ...levant provisions of AS1562 Steelwork 1 F The supporting slab foundation for the garden shed shall be of a minimum size indicated on the installation manual The top surface of the formed slab shall be level and free of any irregularities which would inhibit the installation of the shed 2 F The structural engineering design for the supporting slab foundation shall be undertaken by a suitably qualifi...

Page 25: ...rs wheelbarrows gardentoolsetc Storageitemsthatmightbeadverselyaffectedbyanyoftheaboveconditions may require additional protection such as being sealed or covered by plastic sheets and or stacked above the concrete floor on timber slats Waterproof sealants may be used to offer further protection where required around joins and screw fixings as can rubber door seals and other products which are avail...

Page 26: ...tact the manufacturer directly by phone or email Contact Number 1800 029 701 Contact Email admin absco com au You will be required to produce proof of purchase this is at discretion of the manufacturer at the time of the claim The manufacturer bears the cost of replacing the products or spare parts or repairing the products and reasonable direct expenses of claiming under this warranty Where parts...

Page 27: ...d only be used for storing items such as gardening equipment and should not be used for articles that may be prone to damage if they come into contact with moisture entering 3 Major Defects of providing a replacement product or repairing the product This warranty is provided in addition to other rights and remedies you have under law Our goods come with guarantees which cannot be excluded under th...

Reviews: