5 Commissioning the system – Procedure
85
C
HECK
THE
ELECTRICAL
CONNECTIONS
•
Are all of the sensors and actuators correctly connected and pro-
perly plugged in to the I/O circuit board?
•
Has the mains power supply cable been correctly connected?
– L1 on terminal 100
– L2 on terminal 101
– L3 on terminal 102
– Neutral conductor on terminal N
– Earthing conductor on terminal PE
•
Are the data cables properly attached between central unit, trans-
port module and control unit?
•
Have the unused inputs been bridged?
•
Is the assembly plate earthed?
5.2 Procedure
S
WITCHING
ON
THE
HEATING
SYSTEM
1.
Switch on the circuit breaker for the mains electricity supply, or
otherwise ensure the unit is provided with power.
✓
The heating system is now under voltage.
2.
Turn the heating system main switch on.
✓
The control is activated.
✓
After a start-up phase, the display will first show a switch-on mes-
sage and then show the standard display of
i-01
.
✓
The heating system is now switched on.
S
ETTING
THE
DISPLAY
LANGUAGE
,
BOILER
TYPE
AND
SUPPLY
VOLTAGE
1.
Simultaneously press the
Plus
and
Enter
buttons.
✓
The display changes to the service level.
✓
The cursor is positioned on the parameter group
1-General
.
2.
Press the
Enter
button.
✓
The display switches to the parameter group
1-General
.
Danger!
Dangerous electrical current or voltage
Isolate the mains cable to the heating system.
Enter
Enter
Summary of Contents for Compact 25
Page 1: ...hdg bavaria com HDG Compact 25 80 Operation Manual ...
Page 2: ......
Page 186: ...12 Index 186 HDG Compact 25 35 Version 2 de HDG Bavaria GmbH Oktober 2007 ...
Page 187: ......