4 Planning and installation – Scope of delivery
53
4.3 Scope of delivery
Included in the scope of delivery:
•
HDG Compact 25 - 80 boiler
•
Feeding system (customer-specific)
•
Delivery system (customer-specific)
•
Cleaning tools
•
Operating documentation
Upon delivery, check that the scope of delivery matches the informa-
tion on the delivery note.
4.4 Installing the heating system
The heating system will initially be commissioned by specialists from
HDG Bavaria or from an authorised HDG partner and a qualified elec-
trician.
Danger!
Risk of material damage and injury due to incorrect installation
Installing the system requires comprehensive specialist knowledge.
If installed by untrained persons, the heating system can be da-
maged and persons may be injured due to secondary damages.
Only allow authorised specialists to perform the installation.
Danger!
Dangerous electrical current or voltage
Working on live components can result in an electric shock.
Switch off the mains supply to the heating system during the instal-
lation.
Important!
When laying the pipelines, observe the minimum required clea-
rances.
✎
See section “4.1 Planning the heating system” in this chapter.
Important!
Due to the noise, we recommend acoustic insulation measures for
components which are in contact with the floor, wall or ceiling of
the heating room.
Summary of Contents for Compact 25
Page 1: ...hdg bavaria com HDG Compact 25 80 Operation Manual ...
Page 2: ......
Page 186: ...12 Index 186 HDG Compact 25 35 Version 2 de HDG Bavaria GmbH Oktober 2007 ...
Page 187: ......