4 Planning and installation – Installing the heating system
73
A
TTACHING
COVERS
AND
HOODS
✓
The covers and hoods are attached.
I
NSTALLING
AND
ADJUSTING
THE
ASH
CONTAINERS
1.
Remove the ash containers from the packaging.
2.
Lift up the clamp handles (1).
3.
Insert the ash containers (2) on the ash removal pipe.
4.
Press the clamp handles (1) downward.
✓
Grasp the clamp handles and press the ash containers against the
seal of the ash removal door.
5.
If the clamp handles do not clamp, adjust them as follows.
1.
Mount the cover of the circuit
boards (2) on the boiler with
the Phillips-head screws.
2.
Mount the cover of the ash re-
moval system (3) on the boiler
with the Phillips-head screws.
3.
Mount the three hoods (1) on
the boiler in the reverse se-
quence.
Figure 4/43 - Attaching covers and hoods
3
2
1
Figure 4/44 - Attaching the ash containers
1
2
Summary of Contents for Compact 25
Page 1: ...hdg bavaria com HDG Compact 25 80 Operation Manual ...
Page 2: ......
Page 186: ...12 Index 186 HDG Compact 25 35 Version 2 de HDG Bavaria GmbH Oktober 2007 ...
Page 187: ......