70
Software
Stop Test
This button state is used to stop the measurement, before the count down is
finished
.
The status labels of the DC Resistivity measuring unit have following meaning:
Set Power On
After starting up the 2830 software a power on command will be sent to the DC
Resistivity measuring unit. Before the first DC resistivity measurement will be
done it has to be started up.
Wait Power On
During power up phase.
Wait Calibrated
After powering up a calibration will be done.
Check Calibration
Validate the calibration.
Power On
The unit is started up.
Measure
During a measurement.
Set Stop
A stop command is sent to break the actual running measurement.
Wait Stopped
Wait until the stop command was executed.
Measure Cancelled
When a measurement was not done completely, “Measure Cancelled” will be
labelled.
9.5.1
Test cell shorting
As mentioned in the chapter 9.5 DC Resistivity the liquid test cell should be shorted before a DC
Resistivity measurement is done after a C Tan
measurement.
The shorting is also done in the DC Resistivity tab sheet but no voltage and measuring time has
to be set only the blue shorting time has to be set. During the shorting phase the “U” and “a” plug
on the front panel is shorted.
Summary of Contents for 2830
Page 1: ...2830 2831 Precision Liquid and Solid Dielectric Analyzer User Manual 4843477 M Version 3 0 ...
Page 7: ...Introduction VII 17 Conformity 113 18 Notes 114 ...
Page 8: ...VIII Introduction ...
Page 121: ...Conformity 113 17 Conformity ...
Page 122: ...114 Notes 18 Notes ...
Page 123: ...Notes 115 ...