©
Guldmann
GB
-1394/11/08
2
4.
e
le
ct
rI
ca
l
co
n
n
ec
tI
o
n
These precautions apply to installations made in Denmark.
Local requirements may differ.
Guldmann ceiling hoist and rail systems are manufactured
and installed in accordance with the rules on Electro-
Medical Equipment EN 60601-1 .
Guldmann has a UL/DEMKO approval of its products
which confirms that they meet the requirements contained
in EN 60601-1 .
This regulation defines how medical equipment must
be classified and also how it must be protected so that
danger of electric shock does not arise when handling the
products .
Guldmann ceiling hoist and related rail system are classi-
fied as equipment in Category II – High Voltage Regulation,
Electro-Medical Equipment, Chapter 14 .
Reference is made to Fig . 701A – Area Division 0 to 3 .
Installation of the rail system is carried out with safety
voltage – designated SELV . The safety transformer or safety
charger with a nominal voltage of 24 V AC voltage or
60 V DC voltage .
In accordance with the High Voltage Regulation,
Chapter 701 – AREAS WITH BATHTUBS OR SHOWERS
Chapter 01.4 Protection for safety reasons
When SELV is used (safety voltage), protection against
direct contact must be in place regardless of the size of
the voltage, i .e . to min IP2x .
The geometry of the live midi rails meet the requirements
for protection against contact .
Chapter 01.41.1.6 additional equalizer
Note
Metallic pipes and ducts (Guldmann aluminium rails) which
are only found in these four areas and are not conductive
when in contact with earth or parts outside the areas do not
have to be connected to the equalizers.
Regarding installation of Guldmann rail systems
in bathroom environments
Guldmann power supply (charger and transformer) must
not
be installed and charging of hoist must
not
be
carried out in Areas 0, 1 and 2 . Power supply and charging
area
must
be located outside Area 2, but hoist and rails
may be used inside the area .
If e .g . cleaning by hosing, the power supply and charging
area must be located completely separate from the area in
which splashing with water may occur .
If the rail system is only installed in the bathroom and not
in other rooms outside the bathroom, the rails do
not
need
earthing .
Earthing
must
be done if the rails continue outside the
bathroom - connected by a single rail or a combi-lock
and
the lower edge of the rail is
less than
3 .0 m (120”) above
the floor .
Excepted are:
Single rails hanging higher than 2 .25 m (90”) above the
floor and
not
continuing into Area 0, 1 and 2 .
Traverse rails hanging higher than 2 .25 m (90”) above the
floor and
not
continuing into Area 0, 1 and 2 when it is
positioned in the Combi-lock .
For single rails the earthing may be located as required
either in the bathroom or in the adjacent room .
For Combi-locks the earthing on the single rail is located
outside the bathroom and when the traverse rail is
connected via the Combi-lock, the traverse rail is thereby
earthed in the bathroom .
The parallel rails do not need to be earthed .
Note
These rules have been issued by the Electricity Council
and form part of the High Voltage Regulation .
There
may
be special local requirements for the installation
of rail systems in medical treatment areas .
Any special requirements are carried out without the
participation of Guldmann at the purchaser’s own risk .
El-
installationer
Beskyttelse mod elektrisk stød
Electrical installations
Protection against electric shock
Summary of Contents for GH2
Page 2: ......
Page 4: ......
Page 10: ...Bla bla Guldmann GB 1394 11 08 12 ...
Page 34: ...Bla bla Guldmann GB 1394 11 08 36 ...
Page 73: ...Bla bla Guldmann GB 1394 11 08 75 4 electrical connection Interconnection diagram GH2 twin ...
Page 87: ...Bla bla Guldmann GB 1394 11 08 89 ...
Page 88: ... Guldmann GB 1394 11 08 90 5 control Control 5 Checkliste 88 ...
Page 90: ... Guldmann GB 1394 11 08 92 6 toolbox ToolS 6 Overview of tools for rail installation 93 ...
Page 93: ... Guldmann GB 1394 11 08 95 7 service GH2 Service manual ...
Page 107: ... Guldmann GB 1394 11 08 109 7 service Periodic Inspection ...
Page 108: ......
Page 109: ......