Fixing ceiling brackets GH2/GH2 HD max , kN:
Construction
Rail type
Fixing
HILTI
Number
Remarks
Beton B25
(C20/25)
Mini, Midi,
Maxi &
Jumbo
Concrete screw Hilti HUS-H 10,5 x 55
2
hv = 50mm (2")
Concrete/hollow floor
divider
Mini, Midi,
Maxi &
Jumbo
Concrete screw Hilti HUS-H 10,5 x 55
2
Minimum floor divider
thickness 35 mm (1
3
/
8)
Bauma- / R
Mini, Midi,
Maxi &
Jumbo
Concrete screw Hilti HUS-H 10,5 x 55
2
hv = 50 mm (2")
load test should be done
Hollow bricks
Mini, Midi,
Maxi &
Jumbo
HIT HY70 with mesh screen
2
hv = 80 mm (3
3
/
16
")
Fix in seperate bricks
Hollow brick blocks
Mini, Midi,
Maxi &
Jumbo
HIT HY70 with mesh screen
2
hv = 80 mm (3
3
/
16
")
Fix in seperate bricks
Leca/Fibo elements
>7,5 MPa/1500
kg/m
3
Mini, Midi,
Maxi &
Jumbo
Concrete screw Hilti HUS-H 10,5 x 55
2
hv = 75 mm (3")
hv = minimum anchoring depth
* Ceilings made of “Bauma” or “Romadæk” must
be load tested on site as no unambiguous test
reports are available.
** This also applies to lightweight aggregate clinker
floor dividers as these are manufactured with different
compression strengths and densities.
*** A cone drill must be used on light clinker floor dividers
due to tension zones.
Fixing ceiling brackets
Summary of Contents for GH2
Page 2: ......
Page 4: ......
Page 10: ...Bla bla Guldmann GB 1394 11 08 12 ...
Page 34: ...Bla bla Guldmann GB 1394 11 08 36 ...
Page 73: ...Bla bla Guldmann GB 1394 11 08 75 4 electrical connection Interconnection diagram GH2 twin ...
Page 87: ...Bla bla Guldmann GB 1394 11 08 89 ...
Page 88: ... Guldmann GB 1394 11 08 90 5 control Control 5 Checkliste 88 ...
Page 90: ... Guldmann GB 1394 11 08 92 6 toolbox ToolS 6 Overview of tools for rail installation 93 ...
Page 93: ... Guldmann GB 1394 11 08 95 7 service GH2 Service manual ...
Page 107: ... Guldmann GB 1394 11 08 109 7 service Periodic Inspection ...
Page 108: ......
Page 109: ......