Guldmann
GB
-1394/11/08
46
3.
I
n
st
al
la
tI
o
n
Ceiling installation
Ceiling types
: Wood/plaster ceiling and other
lightweight ceiling constructions .
Reinforcements
: Laid out by Guldmann installer,
above the foot of a rafter
Bracket types
: All GH ceiling brackets .
• We recommend that you start by fitting all brackets .
• Examine the loft and remove objects which may
obstruct drilling .
• Mark the position where the bracket is to be fitted . At
the same time, it should be determined whether plastic
discs should be used between the concrete floor/ceiling
and the ceiling brackets to make the system 100 per
cent level .
Measurement/levelling is performed using laser equipment .
• Drill up through the ceiling . Drill through the holes of the
ceiling bracket using an 12 mm (
7
/
16
") drill .
• Push an item through the holes to mark the holes and
make them visible in the loft .
In this way you avoid having to search for the fixing holes .
• Lay out the reinforcements on the foot of the rafter and
fix them over the drill holes .
• When using timber it must be at least 100 x 150 mm
(4” x 6”) for systems with Combi-Locks . For other
systems use 100 x 100 mm (4” x 4”) .
• Re-drill up through the holes and through the fixed
reinforcements .
• The threaded rods are inserted from above with
self-fixing wood nuts which are hammered into the
reinforcements .
• Mount washer and lock nut on threaded rod from below .
• Tighten the locking nut firmly .
• Screw the threaded rod up through the self-fixing wood
nut to fix the bracket against the ceiling .
• Tighten lock nut and ensure that the track system is
hanging horizontally .
• Fit a counter nut on the threaded rod from the loft so
that the counter nut counter-tightens against the self-
fixing wood nut .
• The threaded nuts can be shortened above the counter
nut if the excess threaded portion is in the way .
• Fit the rails . Turn the T-bolt so that the chamfering on the
sides is perpendicular to the rail .
• When the rails have been fitted to the brackets, tighten
the T-bolts securely .
Fitting of brackets
Summary of Contents for GH2
Page 2: ......
Page 4: ......
Page 10: ...Bla bla Guldmann GB 1394 11 08 12 ...
Page 34: ...Bla bla Guldmann GB 1394 11 08 36 ...
Page 73: ...Bla bla Guldmann GB 1394 11 08 75 4 electrical connection Interconnection diagram GH2 twin ...
Page 87: ...Bla bla Guldmann GB 1394 11 08 89 ...
Page 88: ... Guldmann GB 1394 11 08 90 5 control Control 5 Checkliste 88 ...
Page 90: ... Guldmann GB 1394 11 08 92 6 toolbox ToolS 6 Overview of tools for rail installation 93 ...
Page 93: ... Guldmann GB 1394 11 08 95 7 service GH2 Service manual ...
Page 107: ... Guldmann GB 1394 11 08 109 7 service Periodic Inspection ...
Page 108: ......
Page 109: ......