Guldmann
GB
-1394/11/08
44
3.
I
n
st
al
la
tI
o
n
Fitting of brackets
Ceiling installation
Ceiling types:
Concrete floor or light concrete
Bracket types:
All GH ceiling brackets
• We recommend that you start by fitting all brackets .
• Mark the position where the bracket is to be fitted . At
the same time, it should be determined whether plastic
discs should be used between the concrete floor/ceiling
and the ceiling brackets to make the system level .
Measurement/levelling is performed using laser equipment .
• Drill holes for the recommended fastening elements .
• Fit the GH ceiling brackets directly on the ceiling . Use
either one-hole or two-hole fittings (depending on the
porosity of the ceiling/floor) .
• Fit the rails . Turn the T-bolt so that the chamfering on the
sides is perpendicular to the rail .
• When the rails have been fitted to the brackets, tighten
the T-bolts securely .
Summary of Contents for GH2
Page 2: ......
Page 4: ......
Page 10: ...Bla bla Guldmann GB 1394 11 08 12 ...
Page 34: ...Bla bla Guldmann GB 1394 11 08 36 ...
Page 73: ...Bla bla Guldmann GB 1394 11 08 75 4 electrical connection Interconnection diagram GH2 twin ...
Page 87: ...Bla bla Guldmann GB 1394 11 08 89 ...
Page 88: ... Guldmann GB 1394 11 08 90 5 control Control 5 Checkliste 88 ...
Page 90: ... Guldmann GB 1394 11 08 92 6 toolbox ToolS 6 Overview of tools for rail installation 93 ...
Page 93: ... Guldmann GB 1394 11 08 95 7 service GH2 Service manual ...
Page 107: ... Guldmann GB 1394 11 08 109 7 service Periodic Inspection ...
Page 108: ......
Page 109: ......