Start-up
42 | 80
BA_TD
3-
BM
000e
n_
06
4_sof
tli
Q
-M
C
.docx
Confirmation is only possible if the system has completed the previous step.
This is the case when the ENTER key lights up. The value can be changed
later (refer to chapter 7.7).
Item
Designation
Item
Designation
1
Shut-off valve for raw water
2
Shut-off valve for soft water
3
Sampling valve for raw water
4
Sampling valve for soft water
9.
Open the raw water shut-off valve at the connection block.
10.
Confirm with ▼.
11.
Check for leaks.
12.
Confirm with ▼.
Water flows through the flushing water hose to the drain. This is completely
normal during start-up.
13.
Press ENTER to start the venting program.
2
3
4
1
Summary of Contents for softliQ:MC
Page 1: ...We understand water Water Softener softliQ MC Operation manual...
Page 74: ...Notes 74 80 Notes...
Page 75: ...Notes 75 80 Notes...
Page 76: ...Notes 76 80 Notes...
Page 79: ......