![Grunbeck softliQ:MC Operating Manual Download Page 37](http://html1.mh-extra.com/html/grunbeck/softliq-mc/softliq-mc_operating-manual_2270831037.webp)
Installation
37 | 80
BA_TD
3-
BM
000e
n_
06
4_sof
tli
Q
-M
C
.docx
5.3.3
Establish waste water connection as per DIN EN 1717
The drain connection DN 50 as per DIN EN 1717 for small-scale water softeners makes it
easier to connect according to the DIN standard (refer to chapter 3.6).
NOTE:
Backing up of wastewater due to kinked hoses.
● Risk of water damage.
► Run the hoses to the drain with a downward slope and without kinks and bends.
Summary of Contents for softliQ:MC
Page 1: ...We understand water Water Softener softliQ MC Operation manual...
Page 74: ...Notes 74 80 Notes...
Page 75: ...Notes 75 80 Notes...
Page 76: ...Notes 76 80 Notes...
Page 79: ......