Form No. 20026 XL 4000/5000 Center Pin Rebuild
Part No. 2460-4164
Before starting any center pin procedure, perform the following opera-
tions:
Correct positioning of the upperstructure is a vital part of
machine preparation. If you are working on a wheeled excava-
tor, lift the boom out of the rack, close the bucket, retract
the telescope boom fully and position the boom with the
bucket on the ground at the right front of the carrier. If you
are working on a crawler-mounted excavator, again, retract
the telescope boom fully and position the boom with the
bucket on the ground.
Remember!
The center pin assembly is removed through the top.
Set the machine on blocks with front wheels chocked for easier
access to the underside.
If you are working on a wheeled excavator, you will have to
bleed the air from the upper and lower air tanks. You will also
have to bleed the air from the hydraulic reservoir.
If you are working on a crawler, bleed air pressure from the
hydraulic reservoir.
Disconnect the battery cables and red-tag the machine for
the SAFETY of personnel involved.
P
REPARING
T
HE
M
ACHINE
2.0
l
l
l
l
Summary of Contents for XL4000
Page 2: ......
Page 73: ......
Page 76: ... 5MP ...
Page 145: ......
Page 146: ......
Page 160: ......
Page 161: ......
Page 162: ......
Page 175: ......
Page 176: ......
Page 177: ......
Page 178: ......
Page 192: ......
Page 193: ......
Page 194: ......
Page 207: ......
Page 208: ......
Page 210: ...500P ...
Page 229: ......
Page 230: ......
Page 245: ......
Page 246: ......
Page 247: ......
Page 248: ......
Page 265: ......
Page 266: ......
Page 267: ......
Page 268: ......
Page 280: ......
Page 281: ......
Page 282: ......
Page 297: ......
Page 298: ......
Page 299: ......
Page 300: ......
Page 301: ......
Page 302: ......
Page 303: ......
Page 304: ......