1. PRE-DRILL TWENTY 5/4 X 3 X 16" BRIDGE RAIL SLATS ON EACH END WITH A 1/8" DRILL BIT. (SEE TOP IMAGE BELOW)
2. PLACE THE BRIDGE RAIL SLATS 3" FROM THE FACE OF THE CORNER POSTS, AND ATTACH WITH 2" WOOD SCREWS.
THE SLATS WILL MOUNT ON THE OUTSIDE OF THE BRIDGE RAILS.
3. ATTACH THE REMAINING SLATS TO THE UNIT WITH 3" SPACING BETWEEN THE SLATS.
STEP 15: BRIDGE RAIL SLATS
SLAT
5/4 X 3 X 16"
BRIDGE RAIL
2" WOOD SCREW
5/4 X 3 X 16"
BRIDGE RAIL SLAT
3
4
"
"
1 16
5
5
16 "
"
4
1
1 3
1
2X
1
8 "
LEFT SIDE VIEW
3" SPACE OFF CORNER POST
3" SLAT SPACING
155
Summary of Contents for 1500KWR
Page 6: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 52: ...WAVE SLIDE 03 0013 RAD RIDE SLIDE 03 0002 PICTURE DESCRIPTION QTY 1 1 1 SUPER SCOOP 03 0007 44...
Page 59: ...DESCRIPTION PICTURE QTY 07 0005 2 ONE BAG 6 SAFETY HANDLE 2 HANDLES ARE IN 96 CHAIN SECTION 51...
Page 148: ...PART II CLATTER BRIDGE 140...
Page 177: ...APPENDIX 169...