1: LOCATE TWO 96" CHAIN SECTIONS THAT SHIPPED WITH THE CLATTER BRIDGE.
2: PLACE THE CHAINS OVER THE HOLES IN THE BRIDGE DECK BOARDS AS SHOWN BELOW.
3: LINE UP THE 18TH LINK IN THE CHAINS WITH THE FIRST BRIDGE DECK BOARD HOLES.
STEP 17: BRIDGE DECK AND CHAIN ASSEMBLY
96" CHAIN SECTIONS
B
SCALE 1 : 6
DETAIL B
18TH CHAIN LINK
(LINE UP OVER HOLE
IN FIRST BRIDGE DECK
BOARD)
FIRST BRIDGE
DECK BOARD
157
Summary of Contents for 1500KWR
Page 6: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 52: ...WAVE SLIDE 03 0013 RAD RIDE SLIDE 03 0002 PICTURE DESCRIPTION QTY 1 1 1 SUPER SCOOP 03 0007 44...
Page 59: ...DESCRIPTION PICTURE QTY 07 0005 2 ONE BAG 6 SAFETY HANDLE 2 HANDLES ARE IN 96 CHAIN SECTION 51...
Page 148: ...PART II CLATTER BRIDGE 140...
Page 177: ...APPENDIX 169...