L
1: LINE UP THE HOLES OF THE IRON DUCTILE SWING HANGERS WITH THE HOLES IN THE SWING BEAM. IF YOUR BEAM
IS BOWED SLIGHTLY PLACE THE BOW SIDE UP; THE SWING HANGERS WILL BE ON THE BOTTOM.
2: FASTEN EACH SWING HANGER TO THE SWING BEAM USING 7" CARRIAGE BOLTS WITH TORQUE WASHERS, AND
3/8" WASHERS WITH 3/8" LOCK NUTS.
3: PLACE BOLT CAPS OVER EXPOSED THREADS.
STEP 4
5
: IRON DUCTILE SWING HANGERS
7" CARRIAGE BOLT
3/8" LOCK NUT
TORQUE WASHER
3/8" WASHER
BOLT CAPS
IRON DUCTILE
SWING HANGER
97
Summary of Contents for 1500KWR
Page 6: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 52: ...WAVE SLIDE 03 0013 RAD RIDE SLIDE 03 0002 PICTURE DESCRIPTION QTY 1 1 1 SUPER SCOOP 03 0007 44...
Page 59: ...DESCRIPTION PICTURE QTY 07 0005 2 ONE BAG 6 SAFETY HANDLE 2 HANDLES ARE IN 96 CHAIN SECTION 51...
Page 148: ...PART II CLATTER BRIDGE 140...
Page 177: ...APPENDIX 169...