FLUSH
"
8
5
2
2 58 "
2
"
2
9
8
1
"
8
1
11 16 "
1 "
2 8
1 "
2 8
11 9
16 "
LEFT SIDE
(LADDER SIDE)
(SWING BEAM SIDE)
RIGHT SIDE
5/4 X 3 X 28-1/4"
PANEL SLAT
(ALIGN WITH EDGE
OF NOTCH.)
5/4 X 3 X 28-1/4"
PANEL SLAT
(LEAVE OFF
UNTIL AFTER
INSTALLING THE
CLATTERBRIDGE.)
2: PLACE EACH SLAT AS SHOWN BELOW ON THE INSIDE OF THE PANEL BOARDS AND
ATTACH EACH PANEL SLAT TO THE FORT WITH TWO #8 X 2" WOOD SCREWS.
RIGHT SIDE
(SWING BEAM SIDE)
LEVEL.
SLAT SPACING
1: PLACE THE 5/4 X 3 X 28-1/4" PANEL SLATS INTO THE OPENINGS AS SHOWN BELOW.
SPACE THE SLATS AS INDICATED BY THE DIMENSIONS SHOWN. THERE ARE FOUR SLATS ON
THE LEFT SIDE, SIX SLATS ON THE RIGHT SIDE AND TWO SLATS ON THE FRONT OF THE LOWER
LEFT SIDE
(LADDER SIDE)
SLAT SPACING
STEP 43: LOWER LEVEL PANEL SLATS
95
Summary of Contents for 1500KWR
Page 6: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 52: ...WAVE SLIDE 03 0013 RAD RIDE SLIDE 03 0002 PICTURE DESCRIPTION QTY 1 1 1 SUPER SCOOP 03 0007 44...
Page 59: ...DESCRIPTION PICTURE QTY 07 0005 2 ONE BAG 6 SAFETY HANDLE 2 HANDLES ARE IN 96 CHAIN SECTION 51...
Page 148: ...PART II CLATTER BRIDGE 140...
Page 177: ...APPENDIX 169...