1: PLACE THE SWING BEAM PLATE ON TOP OF THE SWING BEAM MOUNT, LINING UP THE
PILOT HOLES.
2: FASTEN THE SWING BEAM PLATE TO THE SWING BEAM MOUNT USING 3/8" X 3-1/2"
CARRIAGE BOLTS ON TOP AND 3/8" LOCK NUTS WITH 3/8" WASHERS FROM UNDERNEATH.
USE BOLT CAPS TO COVER ANY EXPOSED THREADS.
3: LEAVE THE MIDDLE HOLE EMPTY, IT WILL BE USED LATER.
4: IF NECESSARY USE LOCKING PLIERS TO HOLD CARRIAGE BOLTS IN PLACE WHEN
INSTALLING.
STEP 44: SWING BEAM PLATE
3/8" WASHER
3/8" LOCK NUT
CARRIAGE BOLT
3/8 X 3-1/2"
BOLT CAP
SWING BEAM PLATE
96
Summary of Contents for 1500KWR
Page 6: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 52: ...WAVE SLIDE 03 0013 RAD RIDE SLIDE 03 0002 PICTURE DESCRIPTION QTY 1 1 1 SUPER SCOOP 03 0007 44...
Page 59: ...DESCRIPTION PICTURE QTY 07 0005 2 ONE BAG 6 SAFETY HANDLE 2 HANDLES ARE IN 96 CHAIN SECTION 51...
Page 148: ...PART II CLATTER BRIDGE 140...
Page 177: ...APPENDIX 169...