background image

Model CH2727

ECN 1805 (ECN2805)

Page 1 of 8

Installation Instructions

Installation Instructions

Challengers

®

 Model CH2727

48 in. (1219 mm)

Twist and Shout Slide

Installation Preparation 

 

 

 

 

Recommended Crew: ........................... Two (3) adults
Installation Time: ................................... 3 man-hours
Concrete Required: ............................... 0.06 cubic yard (0,05 cubic meters) 
Use Zone: .............................................. Refer to Master Drawing
User Group Age (years): ....................... ASTM/CSA: 2-12, EN: 2-14

Assembly View

ICON KEY

Fully Tighten 

Hardware

Critical Fall Height

Do 

Not

 Fully Tighten 

Hardware

Pour Concrete

Drill

Dig Footing Holes

Hammer

Summary of Contents for Challengers CH2727

Page 1: ... Installation Preparation Recommended Crew Two 3 adults Installation Time 3 man hours Concrete Required 0 06 cubic yard 0 05 cubic meters Use Zone Refer to Master Drawing User Group Age years ASTM CSA 2 12 EN 2 14 Assembly View ICON KEY Fully Tighten Hardware Critical Fall Height Do Not Fully Tighten Hardware Pour Concrete Drill Dig Footing Holes Hammer ...

Page 2: ...27 ECN 1805 ECN2805 Page 2 of 8 Top View Elevation Views Footing Diagram 78 3 1990 mm 53 2 1351 mm 11 279 mm 38 965 mm 48 1219 mm Surfacing Level 18 457 mm Diameter 48 1219 mm 64 1626 mm 13 5 343 mm 12 305 mm Diameter 21 533 mm 48 1219 mm ...

Page 3: ...ost directly on packed stone ThefootingsshownonPlayworldSystems documentationarerecommendations based on historical performance in average soil conditions Footing dimensions may be modified by the owner based on actual soil conditions For example If local soil is loose or unstable a larger footing may be required If local soil is considered stable such as bedrock clay or hard packed earth a smaller...

Page 4: ... description The step descriptions start on page 6 3 8 x 3 4 Button Head Bolt BAE0659 3 8 x 3 4 Button Head Bolt BAE0659 1 O D Flat Washer BAE0600 1 O D Flat Washer BAE0600 Exit Support APT0216 Slide BPL2038 3 8 x 1 1 2 Button Head Bolt BAE06645 3 8 x 1 Button Head Bolt BAE0664 1 O D Flat Washer BAE0600 3 8 Flat Washer BAE0595 3 8 Lock Nut BAE0620 1 O D Flat Washer BAE0600 Bolt Cap BPL0300 Plastic...

Page 5: ... Clamp AAU0556 Top Rail AFM Support Post 3 8 x 1 1 4 Tamper Resistant Bolt BAE0662 Detail 12 Step H Centerline Clamp AAU0556 Drive Rivet BAE0020 Support Post Detail E Step 8 Detail F Step 9 3 8 x 1 3 4 Button Head Bolt BAE0665 3 8 x 1 Set Screw BAE0629 Slide BPL2038 Canopy BPL2040 Canopy BPL2040 ...

Page 6: ...o not attach bolt caps until the structure is completely assembled and properly footed __Step 6 Make the upper attachments to the slide and deck See Detail C Select the appropriate hardware There are 6 six connections Attach as shown Assemble the canopy top rail __Step 7 Attach the clamps to the top rail See Detail D Select the top rail and the centerline clamps and the appropriate hardware There ...

Page 7: ...ll drive rivets See Detail H After the equipment assembly is complete install a drive rivet in each clamp to permanently secure it to the support post Using a 1 4 drill bit drill through the clamp and support post Insert the drive rivet into drilled hole until the head of the rivet is against the surface of the clamp Using a hammer drive the pin of the rivet until it is flush with the surface of th...

Page 8: ...8 16 LOCK w NYLON CAP 6 BAE0629 SCREW 3 8 16 x 1 SOCKET SET SS 2 BAE0659 BOLT 3 8 16 x 3 4 BUTTON HEAD SS 4 BAE0662 BOLT 3 8 16 x 1 1 4 TAMPER RESISTANT 2 BAE0664 BOLT 3 8 16 x 1 BUTTON HEAD SS 8 BAE06645 BOLT 3 8 16 x 1 1 2 BUTTON HEAD SS 6 BAE0665 BOLT 3 8 16 x 1 3 4 BUTTON HEAD SS 4 BAE0936 WASHER 3 8 I D x 1 1 4 O D FENDER 6 BPL0300 CAP 3 8 BOLT 6 BPL2038 SLIDE TWIST AND SHOUT 1 BPL2040 CANOPY...