GBESS 2.4_4.8KWH system user manual
7
Please add an AC breaker K-grid before the energy meter if users need to switch to off-grid function
manually, please refer to Figure 5.
PV1
PV2
BUS
GRID
LOAD
DC Switch
ON
OFF
WIFI
TO BAT
CAN
RS485
Ethernet
BUS
TO PV
CAN
BAT
B
A
T
C
H
G
D
IS
C
H
G
Distribution box
Load
Meter for Grid
Emergency load
PV PANEL
Geatom103KHF system
Battery Cabinet
Lead type battery
B5
B6
D3
F3 F4
SET
Single Energy Meter
L
N
L’
N'
5 6 7 8
PV INVERTER
DC
AC
Meter for PV
SE
T
Si
ng
le
E
ne
rg
y
Me
te
r
L
N
L’
N'
5
6
7
8
L
N
K-GRID
To
Meter
DC
BREAKER
To
Inerter
To
Cabinet
Figure 5 System Connection for Manual Off-grid Switching
3. System installation
3.1 Unpacking the Device
3.1.1 Before Unpacking
All products are thoroughly tested and inspected before they’re packed and transported. Although
they’re shipped in reliable package, damage during transportation could still occur.
It is important to inspect the shipping package prior to the installation carefully. If any external
damage on the package makes you suspect the device could be damaged or if you find that the device
is damaged after unpacking it, report the damage immediately to your distributor or the goods
forwarder.
If it becomes necessary to return the device, please use the original packages in which they were
delivered.
The gross weight of SolDate 3100/3700TL is 25kg, for which BM024 is 10kg. To avoid injury, take the
device by the two holding grips that are visible on the side and take the device out of the package.
Ensure a second person to assist in the unpacking and installation of the devices.