GBESS 2.4_4.8KWH system user manual
6
Battery packs stores the energy generated from PV generator. Generally each battery module’s
capacity is 2.4kWh; so two battery modules can constitute 4.8kWh battery pack.
4)
Energy meter
Two 1-phase bi-directional energy meters are needed. One is for grid data collection, another is for PV
inverter data collection. With the meter data, the GEatom 103KHF decides when to charge/discharge
the battery packs.
2.2 System Connection
The four main components are connected as displayed in Figure 1, which can not only optimize solar
energy self-use and realize peak shaving, but also protect family from power outages.
PV Inverter
DC
AC
DC
AC
Geatom103KHF
DC
AC
DC
AC
PV
GRID
LOAD
K-battery
BAT
S
E
T
Si
ng
le
E
ne
rg
y
Me
te
r
L
N
L
’
N
’
5
6
7
8
K-inv
Grid
K-load
Meter for Grid
K-el
Emergency Load
Load
S
E
T
Si
ng
le
E
ne
rg
y
Me
te
r
L
N
L
’
N
’
5
6
7
8
K-pv
Meter for PV
Figure 3 System Wiring Diagram (meter for grid without CT)
Attention: The nominal current of meter is only 20A. If the power of load and emergency load is
larger than 4.6kW, the system is recommended to change a meter with CT as
Figure 4
to avoid from
current over range.
PV Inverter
DC
AC
DC
AC
Geatom103KHF
DC
AC
DC
AC
PV
GRID
LOAD
K-battery
BAT
S
E
T
S
i
n
g
l
e
E
n
e
r
g
y
M
e
t
e
r
L
N
L
’
N
’
5
6
7
8
K-inv
Grid
K-load
K-el
Emergency Load
Load
S
E
T
S
i
n
g
l
e
E
n
e
r
g
y
M
e
t
e
r
L
N
L
’
N
’
5
6
7
8
Meter for PV
K-pv
CT
Meter for Grid
Figure 4 System Wiring Diagram (meter for grid with CT)