49
EOF 20/20
Fryer Operation
6. Connect the Discharge Hose
to the Discharge Hose Coupling
.
7.
Place the discharge end into a Hot Oil Disposal Container
(Giles Oil Caddy shown).
8. Turn the Oil Diverter Valve to the TO DISCHARGE HOSE
position.
11
10
9
8
5-04. Removal of Liquid Shortening (Continued from previous page)
8
9
10
12
11
13
•
During the next step be sure the wear Oven Mitts if holding the Discharge Hose, as the hose will
become very hot
.
!
WARNING
9. Press the Pump Switch to the PUMP
position and allow the liquid shortening to pump into the
Disposal Container.
10. After the Liquid Shortening is removed from the Filter Pan, press the Pump Switch to the OFF
position.
13
12
Continued next page
Summary of Contents for EOF-20/20
Page 2: ......
Page 4: ......
Page 7: ...v Table Of Contents EOF 20 20 ...
Page 8: ...vi Table Of Contents EOF 20 20 Notes ...
Page 16: ...4 Introduction EOF 20 20 Notes ...
Page 22: ...10 Overview EOF 20 20 3 01 EOF 20 Basket Elevator and Baskets 4 2 1 3 ...
Page 24: ...Overview EOF 20 20 12 3 02 EOF 20 Control Panel 6 5 4 3 2 1 7 ...
Page 26: ...14 Overview EOF 20 20 3 03 EOF 20 Left Lower Cabinet Area 2 1 3 ...
Page 28: ...16 Overview EOF 20 20 3 04 EOF 20 Right Lower Cabinet Area 2 1 3 ...
Page 30: ...18 Overview EOF 20 20 3 05 EOF 20 Basket Hanger and Baskets 2 1 3 ...
Page 32: ...20 Overview EOF 20 20 3 06 Filter Pan Assembly 6 4 7 3 2 1 5 ...
Page 64: ...52 Fryer Operation EOF 20 20 Notes ...
Page 70: ...58 Cleaning EOF 20 20 Notes ...
Page 90: ...78 Parts List EOF 20 20 Notes ...
Page 100: ...88 Wiring Diagram EOF 20 20 Notes ...
Page 101: ......