29
EOF 20/20
Unit Preparation
29
4-02. Power test
1.
Follow steps shown in Section 4-1.
2. Ensure the main circuit breaker powering the unit is ON.
If a Quick Disconnect Box is used, ensure it is ON.
3. Press the Power Switch to the ON
position. The
green POWER light
will come on. Please proceed to
Section 4-3.
If the POWER light does not come on, refer to the
Troubleshooting procedure in Section 7-1.
2
1
1
2
The following test will ensure the unit has power. Perform this test on each unit.
EOF-20
Summary of Contents for EOF-20/20
Page 2: ......
Page 4: ......
Page 7: ...v Table Of Contents EOF 20 20 ...
Page 8: ...vi Table Of Contents EOF 20 20 Notes ...
Page 16: ...4 Introduction EOF 20 20 Notes ...
Page 22: ...10 Overview EOF 20 20 3 01 EOF 20 Basket Elevator and Baskets 4 2 1 3 ...
Page 24: ...Overview EOF 20 20 12 3 02 EOF 20 Control Panel 6 5 4 3 2 1 7 ...
Page 26: ...14 Overview EOF 20 20 3 03 EOF 20 Left Lower Cabinet Area 2 1 3 ...
Page 28: ...16 Overview EOF 20 20 3 04 EOF 20 Right Lower Cabinet Area 2 1 3 ...
Page 30: ...18 Overview EOF 20 20 3 05 EOF 20 Basket Hanger and Baskets 2 1 3 ...
Page 32: ...20 Overview EOF 20 20 3 06 Filter Pan Assembly 6 4 7 3 2 1 5 ...
Page 64: ...52 Fryer Operation EOF 20 20 Notes ...
Page 70: ...58 Cleaning EOF 20 20 Notes ...
Page 90: ...78 Parts List EOF 20 20 Notes ...
Page 100: ...88 Wiring Diagram EOF 20 20 Notes ...
Page 101: ......