63
7.3 DLM AUTOSTART VERSION
7.3.1 INSTALLATION AND CONFIGURATION OF THE ENERGY METER
The use of the operating mode called DLM requires the pre-arrangement of the electrical system as indicated
below. If this is not done, this mode cannot be used.
The first requirement is the presence of an energy meter (code GWD6812 or GWD6817) in the electrical system.
This device must be installed downstream of the main switch (usually a residual current circuit breaker) and up-
stream of all the various circuit breaker protections installed in order to measure all domestic loads.
Once it is installed and powered, it is necessary to set 2 energy meter parameters so it can communicate correctly
with the charging station.
The parameters available are:
- NODE SERIAL ADDRESS
→
parameter P-20
→
must be set to 2
- SERIAL SPEED
→
parameter P-21
→
must be set to 38400
Refer to the energy meter manual to set these parameters.
GWD6812 OR GWD6817
Main switch
Dedicated
energy meter
High domestic load
protection devices
Charging station
protection devices
Summary of Contents for JOINON I-CON PREMIUM GWJ3201A
Page 15: ...15 Fissaggio mediante staffe supporto palo GW46551 ...
Page 41: ......
Page 55: ...55 Fixing with the aid of support brackets on pole GW46551 ...
Page 81: ......
Page 95: ...95 Fixation sur pattes support du poteau GW46551 ...
Page 121: ......
Page 135: ...135 Fijación mediante grapas de soporte poste GW46551 ...
Page 161: ......
Page 175: ...175 Befestigung mit Masthalterungen GW46551 ...
Page 201: ......
Page 215: ...215 Fixarea cu ajutorul suporturilor de susținere a stâlpului GW46551 ...
Page 241: ......
Page 255: ...255 Rögzítés oszlopra való tartókengyelekkel GW46551 ...
Page 281: ......
Page 295: ...295 Bevestiging met behulp van steunbeugels paal GW46551 ...
Page 321: ......
Page 322: ......
Page 323: ......