Servicing intervals
Component
Measure
Valve with elastomer valve seat seal such as
EPDM, FKM, HNBR
Valve with
TEFASEP® gold
valve seat seal
Feedback
Check of mechanical parts and visual
inspection of condition – function test
Check of mechanical
parts and visual
inspection of condition
– function test
Pneumatic
connections
Check of mechanical parts and visual
inspection of condition – function test
Check of mechanical
parts and visual
inspection of condition
– function test
Electrical connections
Check of mechanical parts and visual
inspection of condition
Check of mechanical
parts and visual
inspection of condition
10.4
Prior to disassembly
Requirement:
•
Make sure that during maintenance and servicing work no process is in
operation in the area concerned.
Carry out the following steps:
1.
Drain all pipe system elements that lead to the valve and, if necessary, clean
or rinse them.
2.
Disconnect the power supply.
3.
Take the valve out of the pipe section, with all housings and housing
connections if possible.
®
Done.
10.5
Disassembling the valve
10.5.1 Disassembling the main valve
Maintenance
Prior to disassembly
430BAL013307EN_8
04.08.2022
45
Summary of Contents for D-tec D
Page 66: ...Fig 39 Maintenance Assembling the valve 430BAL013307EN_8 66 04 08 2022...
Page 69: ...Fig 41 Maintenance Assembling the valve 430BAL013307EN_8 04 08 2022 69...
Page 85: ...Fig 55 Housing Parts list D tec double chamber valve type D DV 430BAL013307EN_8 04 08 2022 85...
Page 91: ...Fig 58 hard seal Parts list D tec valve insert D DV SV NC NO 430BAL013307EN_8 04 08 2022 91...
Page 99: ...Fig 61 Dimension sheet double chamber valve type D DV 430BAL013307EN_8 04 08 2022 99...
Page 105: ...Appendix 430BAL013307EN_8 04 08 2022 105...
Page 106: ......