Do not climb on the valve. Use suitable access aids and working platforms.
•
Mark the lines (if unmarked) prior to disassembly to ensure they are not
confused when re-assembling.
•
Protect open line ends with blind plugs against ingress of dirt.
•
Pack sensitive parts separately.
•
For longer periods of standstill, observe the storage conditions, see
Section 4.1, Page 21.
10.2
Inspections
Between the maintenance periods, the components must be checked for leakage
and proper function.
10.2.1 Leakage outlet
Fig.18:
Leakage outlet
Carry out the following steps:
1.
Check the leakage opening regularly to determine if they are free of
contamination.
2.
Check the leakage cavity for soiling and continuous leakage of fluids.
®
Done
10.2.2 Pneumatic connections
Carry out the following steps:
1.
Check the operating pressure at the pressure reducing and filter station.
2.
Regularly clean the air filter in the filter station.
3.
Check that the air hoses sit firmly in the air connections.
4.
Check the lines for kinks and leaks.
5.
Check the solenoid valves for proper function.
®
Done
10.2.3 Electrical connections
Maintenance
Inspections
430BAL013307EN_8
42
04.08.2022
Summary of Contents for D-tec D
Page 66: ...Fig 39 Maintenance Assembling the valve 430BAL013307EN_8 66 04 08 2022...
Page 69: ...Fig 41 Maintenance Assembling the valve 430BAL013307EN_8 04 08 2022 69...
Page 85: ...Fig 55 Housing Parts list D tec double chamber valve type D DV 430BAL013307EN_8 04 08 2022 85...
Page 91: ...Fig 58 hard seal Parts list D tec valve insert D DV SV NC NO 430BAL013307EN_8 04 08 2022 91...
Page 99: ...Fig 61 Dimension sheet double chamber valve type D DV 430BAL013307EN_8 04 08 2022 99...
Page 105: ...Appendix 430BAL013307EN_8 04 08 2022 105...
Page 106: ......