Chapter 5: Panel Indicators and Connectors--Front Panel
5 - 1
Chapter 5
:
Panel Indicators and Connectors
Front Panel
Power Switch
The
Power
button is on the far right side of the Interface 1000 Front Panel. It is a push-push switch: push once
to turn the instrument on and push again to turn the instrument off. The switch’s button latches: the button is
closer to the front panel when the instrument is on than when it is off.
Normally the
Power
LED illuminates when the Interface 1000 is powered on; see the
Power
LED description
below.
Normally, the DC power is connected before the
Power
button is turned ON. However, no damage occurs if
this switch is already in the ON position when the cable is connected to
Power In
, or when the AC power
input is connected to the external power supply.
The Power LED
The
Power
LED is on the lower right of the Interface 1000 front panel. It normally glows a continuous blue
when the Interface 1000 is turned on and has passed some simple power-on tests.
When the Interface 1000 is first turned on, the
Power
LED glows steadily for a second or two, blinks three
times, and then goes to its normal steady blue output.
When the
Power
LED is off, these are possible causes:
Caution:
Avoid touching the
Power
switch button during normal instrument operation.
Data are lost if the instrument is accidentally powered off during an experiment.
The Interface 1000 uses three DIN connectors for connections to external devices. The three
DIN connectors all have different numbers of pins and physical sizes, so the cables used in them cannot be
interchanged or improperly connected.
Power
button
Power
LED
Summary of Contents for Interface 1000
Page 8: ......
Page 18: ......
Page 36: ...Chapter 4 Cell Connections Membrane Cell Connections 4 4...
Page 44: ...Chapter 5 Panel Indicators and Connectors Rear Panel 5 8...
Page 62: ...Chapter 8 Measurement of Small Signals Floating Operation 8 8...
Page 68: ...Appendix A Interface 1000 Specifications Floating Operation Appendix A 6...
Page 70: ...Appendix B Interface 1000 Cell Connector Floating Operation Appendix B 2...
Page 78: ...Appendix E CE Certificate Appendix E 2 Low Voltage Certificate of Conformance...
Page 79: ...Appendix E CE Certificate Appendix E 3 RFI Certificate of Conformance...
Page 80: ...Appendix E CE Certificate Appendix E 4...
Page 84: ...Appendix F Heat in Interface 1000 MultEchem Systems Appendix F 4...